| Projects Kaanapali Ocean Resort Phase 2:
|
|||||
![]() |
|||||
![]()
Typical corridors were lined with nearly 5 1/2 miles of crown molding, chair rail and base. |
|||||
|
|
![]()
Typical suite unit work included the vanity cabinet, furnished by Starwood. We assembled and installed over 300 of these vanities. Our scope also included the installation of nearly 1,500 bath accessories in the guestrooms. |
||||
![]()
Each unit has a full kitchen in which our scope of work included the framing of the pony wall for the plumbing, and installation of the MDF panels and trim on the living room side of the wall. We installed over 2,500 cabinets in the units, and plywood subtops for the granite counters. |
|||||
![]()
In addition to the cased openings, tile cap we installed over 78,000 feet of base, chair rail and crown molding in the units. |