| This project includes
455 condominium units. As a subcontractor to Beaubois of Canada we
installed all the kitchen and bath cabinets and millwork in the units and
public spaces.
|
|||||
|
|
One of the completed kitchens shows the detailed cabinet work that is included in the installation. the island installation include setting end panels and back panels. the upper cabinets have scribes at the ceiling and light valance for the under cabinet lighting. All toe kick was installed after the wood flooring to allow the flooring to run under the panels. Appliance panels on the built in refrigerator completed the installation.
Protection of the installed cabinets was a high priority on this project. After installation we wrapped all base cabinets with cardboard.
the protection including wrapping the sink cabinet doors to allow for the plumbers to complete their work without having to remove the protection.
Bath vanities have the same end panels and detail as the kitchens.
In addition to the cabinet installation our crews installed over 120,000 Lineal feet of wood base including base at the round columns, and installed over 130,000 feet of door casing.
Lobby paneling installed over painted drywall with flush wood base and built up mirror frames
Elevator lobbies have walnut veneer door surrounds and painted wood base
Public spaces have flush veneer paneling
Custom reception desk and wallnut veneer paneling
Maple veneer wood doors and matching maple veneer flush paneling
Maple veneer bookcase
Maple veneer flush wall paneling
|
||||
|
|
|||||