Home > Projects > Hotels

Home

Projects

Profile

Contacts

News

Testimonials

This is only a partial listing of the hotel projects we have completed

 

Completed Projects
Hotels:
Project Name Contractor Completed Type of Project Scope
Sheraton Waikiki Lobby Renovations
Waikiki, HI
Nordic PCL construction November 2009 Hotel Renovation New lobby, retail and restaurant spaces
Princeville Ocean Resort, Westin Princeville Unlimited Construction October 2008 Resort Hotel / timeshare Wood and hollow metal doors, Modular and custom cabinets and casework, public are millwork, bath accessories.  Project consisted of 173 two bedroom luxury units with complete kitchens, wood base and crown molding throughout.
Marriott Vacation Club Ko'olina
Phase 4
Nordic PCL Construction October 2008 Resort Hotel / Time share Guestroom doors, base, crown molding, kitchen and bath cabinets, bath accessories.  Public space millwork, custom casework, wall paneling and trim, miscellaneous specialties, wood and hollow metal doors and frames, door hardware.
Marriott Vacation Club, Kaanapali
Maui, HI
Swinerton Builders August 2007 Resort hotel / timshare Guestroom doors, base, crown molding, kitchen and bath cabinets, bath accessories.  Public space millwork, custom casework, wall paneling and trim, miscellaneous specialties, wood and hollow metal doors and frames, door hardware.
Pan Pacific Hotel at 2200 Westlake Turner Construction December 2006 Hotel Wood and hollow metal doors, wood base and ceiling trim, cabinets and casework, custom wall paneling and trim
Marriott Vacation Club Ko'Olina Phase 2 and 3 Nordic/ PCL May 2006 Resort Hotel / Timeshare Guestroom doors, base, crown molding, kitchen and bath cabinets, bath accessories.  Public space millwork, custom casework, wall paneling and trim, miscellaneous specialties, wood and hollow metal doors and frames, door hardware.
Kaanapali Ocean Resort Phase 2 Hawaiian Dredging Construction June 2005 Resort Hotel / Timeshare Wood and hollow metal doors, Modular and custom cabinets and casework, public are millwork, bath accessories.  Project consisted of 171 two bedroom luxury units with complete kitchens, wood base and crown molding throughout.  The cabinet and millwork installation lasted approximately 10 months. 
Marriott Vacation Club, Ko'Olina Phase 1 Dick Pacific Construction December 2002 Resort Hotel / Timeshare Guestroom doors, base, crown molding, kitchen and bath cabinets, bath accessories.  Public space millwork, custom casework, wall paneling and trim, miscellaneous specialties, wood and hollow metal doors and frames, door hardware.
Grand Hyatt Seattle 
 
Hedreen LLC August 2001 Hotel Custom millwork and casework including wall paneling and trim, wood base and ceiling trim throughout public areas and guestrooms, wood doors and frames, hollow metal doors and frames and finish hardware  See our Elliott Grand Hyatt Hotel page for additional details
Sheraton Maui Renovations Hawaiian Dredging Feb 1997 Resort Hotel Resort hotel renovations, including over 500 guestrooms and extensive common areas, wood ceiling treatments with large false beams and trim. Extensive meeting room millwork treatments.
Royal Gardens Hotel Cederquist Nov 1993 Hotel Lobby Improvements Lobby renovations, ceiling moldings, bar counters and custom registration desk casework.
Kea Lani Hotel Villas Fletcher Pacific Nov 1991 Resort Hotel Resort hotel villas, 12 suites in 6 buildings with large kitchens and wood trim throughout
Kea Lani Hotel Fletcher Pacific Nov 1991 Resort Hotel 350 room Mediterranean style resort suite hotel. Extensive common area millwork including large folding exterior doors
Grand Hyatt Wailea Fletcher Pacific Sep 1991 Resort Hotel Resort hotel with 800+ units. Guestrooms featured crown molding, base and suites featured extensive millwork finishes. The common areas include large meeting and ballrooms, restaurants and spa facilities all with custom millwork and casework throughout. Large custom folding doors were installed at the formal restaurant which are over 18' high and 2 1/2" thick.
Hyatt Regency Kauai Hawaiian Dredging 1990 Resort Hotel Resort hotel with 350 rooms and suites guestroom standing and running trim totaled nearly 10 miles installed. Common areas included extensive millwork throughout the meeting facilities and restaurants.
Hawaii Prince Hotel Hawaiian Dredging 1992
Luxury Hotel 350 luxury hotel units, lobby and meeting facility millwork trim and paneling. Including extensive ballroom ceiling false beams.
Embassy Suites Kaanapali Pacific Construction 1991
Suite Hotel Suite hotel with 300+ rooms
Sherry Waikiki Nordic Construction 1991
Hotel Boutique hotel renovation, 115 suites which included custom casework style headboards in each room.
Westin Kauai Hawaiian Dredging 1989
Resort Hotel Resort hotel complete renovation, Over 600 rooms, plus extensive wood paneling and millwork at common area lobbies and retail areas.
Hyatt Regency Waikoloa Hawaiian Dredging 1989
Resort Hotel Resort hotel with over 1200 rooms. Common areas include meeting facilities and many theme restaurants with extensive wood finishes throughout.
Pacific Beach Hotel N/A N/A Hotel 495 Unit hotel in the heart of Waikiki
Hyatt Regency Waikiki N/A N/A Hotel 820+ hotel rooms plus common areas which featured extensive mahogany paneling, trim and retail storefronts
Maunalani Hotel N/A N/A Resort Hotel Resort hotel with 350+ rooms and extensive common areas with custom casework and millwork.

© 2000 - 2010

Bruce Matson Company, Inc.