Our installation included hanging over 1,600 interior doors in the 178 independent living units. Doors were delivered to the site pre-hung. We unloaded and stocked all doors to the openings. Doors were hung and the hardware installed after finish paint.
|
|||||
|
|
As with the doors we unloaded the trucks on the project site and stocked the cabinets to the units. |
||||
| In addition to the cabinets and doors we installed over 45,000 lineal feet of MDF baseboard and 700 window sills. The assisted living facility has 60 units in a separate tower. We installed cabinets and doors in these units concurrently with the independent living tower.
|
|||||