Home > Projects > Medical > Tripler Army Hospital Ambulatory Care Center

Home

Projects

Profile

Contacts

News

Testimonials

Projects
Tripler Army Medical Center
Ambulatory Care Center:

Tripler Ambulatory Care Center - ExteriorThis project completed in February 2000 provides a new state of the art medical treatment facility for the Military.  General contractor was S&M Sakamoto.

3rd floor conference roomThe large conference room on the third floor received wood wainscot paneling which was installed over furring strips.  

 

2nd floor elevator lobbyElevator lobbies were paneled with maple veneer flush panels and reveal strips over plywood furring.  

A dark stained red oak hand rail was then installed to Acrovyn handrail brackets.  

Solid maple handrails were also installed at the railings


© 2000 - 2010

Bruce Matson Company, Inc.

Main Lobby reception deskThe main lobby reception desk at the right was assembled from sections on site and set into place. 

The Corian countertops were then installed and seamed at the fabricator prepared locations to complete the installation.